The Work tracker is a heatmap: rows represent developers, columns represent time, and cell intensity represents allocated work. Heatmaps encode numeric magnitude by color; Plotly's heatmap documentation illustrates the chart family.
Use Day or Week under Resolution, and Hours or Capacity under Values. Capacity compares allocation with the developer's available hours. The current drawing distinguishes weekends, holidays, and available but unallocated time, and adds Goal deadline and milestone references. Developer labels summarize allocations; hover cells and markers for their details.
Empty working and non-working cells each carry a reason. Non-working days are tinted and named: gray for a Weekend, amber for a Holiday, and lavender for a Day off, which marks a date an availability override reduces capacity to zero. When several reasons apply to one day, the most specific wins: a holiday is shown rather than a weekend, and a weekend rather than an availability gap. The legend below the grid lists every reason that occurs in the current drawing.
A working day with available, completely unallocated time is pale green — Available, unallocated. Hovering it names why the capacity went unused: Assignable work went untaken, when ready work existed but stayed idle; Their assigned work starts later, when all remaining feasible work begins on a later day; Waiting on a dependency, when an unfinished prerequisite holds the work; No work left in the project; Remaining work belongs to another developer; Locked out of the remaining work, when project access excludes them; or No matching work for their skills, which also lists the missing skills. A day with partial allocation never shows this tint; its own utilization already tells that story.

Figure 40. Daily Work tracker showing forecast allocations, availability, deadlines, and milestone references.
Step by step
- Click Work tracker.
- Use Day to inspect daily allocation for each developer.
- Hover a cell to read the allocated hours and contributing tasks.
- Inspect non-working-day details when available. Hover a tinted cell to read its reason — weekend, holiday, or day off — and a pale-green cell to read why available time went unallocated.
- Select Week for a long interval. Each weekly cell shows average hours per visible calendar day; the tooltip supplies the week's total and task contributions.
- Switch Values → Capacity when you need to compare utilization with available capacity rather than raw hours.
- Look for persistent empty working periods or long stretches of high allocation, then check dependencies, skills, and capacity assumptions.
- Export the chosen daily or weekly presentation.
The heatmap shows Sundial's simulated allocations and does not import real-world timesheets. Weekly averages include visible non-working days, so they need not equal a person's nominal working-day hours.

Figure 41. Work tracker Capacity mode showing allocation relative to each developer's available hours.